
Fully permitted ADUs across San Diego County, designed and built by one licensed team.
An ADU (accessory dwelling unit) is a second, fully permitted home on your lot: a backyard cottage, an attached unit, or a converted garage. Proactive Edge Developments is a CSLB-licensed San Diego general contractor (license #768545), voted Best of Houzz ten years running, that designs around one goal: turning space you already own into rentable, appraisable square footage. License CSLB #768545.
Standalone backyard units or additions attached to your existing home, designed to maximize rentable square footage on your lot.
We manage the entire San Diego ADU permitting process — code compliance, plan checks, and approvals — so you don't have to.
Every ADU is designed around return: livable layouts, durable finishes, and a footprint that appraises and rents.
See your finished ADU before we build it, with our in-house design software — included free for every new client.
Every year your home appreciates, but an empty yard corner or unused garage earns you nothing. An ADU changes that. It can bring in rental income, house a family member, or raise your appraisal and resale value. For many San Diego lots, it is the highest-return project you can build.
Honest answer: it depends on the type, size, finish level, and site conditions (slope, soil, utilities, fire zone). Published 2026 San Diego figures:
| ADU type | Typical all-in range | Source |
|---|---|---|
| Garage conversion | $80,000 – $210,000 | Dwelling Index, 2026 |
| Attached ADU | $160,000 – $300,000+ | Dwelling Index, 2026 |
| Detached ADU, ~500 sq ft | ~$300,000 | SnapADU, March 2026 |
| Detached ADU, ~750 sq ft | ~$350,000 | SnapADU, March 2026 |
| Detached ADU, ~1,000 sq ft | ~$425,000 | SnapADU, March 2026 |
Our own planning range for San Diego ADU construction is about $300–$500 per square foot. A detached 800 sq ft ADU often lands between $240,000 and $400,000.
City of San Diego permit records show the median construction value declared on 2026 single-ADU permits was $120,900. That number leaves out design, city fees, and utility work, so expect your all-in cost to be higher (sandiegoaducost.com, City permit data).
Want a ballpark for your lot? Use our free project calculator, then book a free on-site estimate. You will know the number before we start.
What moves the price:
Every ADU we build is fully permitted. We handle the plan set, the city submittal, the corrections, and the inspections. Rules differ by city: the City of San Diego, Carlsbad, Encinitas, Chula Vista, and unincorporated County areas each have their own process. Coastal lots (La Jolla, Del Mar, Encinitas, Coronado) can need extra coastal review. The City of San Diego's requirements are published in Information Bulletin 400.
Most contractors make you wait months while ADU plans crawl through permitting. We sequence your project so work starts now and never stops.
Already have approved plans? We break ground right away.
One property, reimagined as two. At 3680–3682 Curlew St in San Diego, we added a second story to the main house and converted the garage into a separate unit. The owner now has two distinct, rentable addresses on a single lot, both move-in ready.
We build across San Diego County. That includes La Jolla, Del Mar, Coronado, Point Loma, Pacific Beach, Carmel Valley, Encinitas, Carlsbad, Rancho Santa Fe, Poway, Escondido, La Mesa, El Cajon, Chula Vista, and nearby communities.
Every new client gets one free 3D rendering, made with our in-house design software — so you see the finished result before a single nail goes in.
Our planning range is about $300–$500 per square foot. A detached 800 sq ft ADU often runs $240,000–$400,000. Garage conversions usually cost less because they reuse the existing structure. Use our calculator for a ballpark, and book a free on-site estimate for a real number.
It depends on design, city review, and site conditions, and we give you a written schedule at your estimate. Under California law (Gov. Code §66317), when there is already a home on the lot, the city has to approve or deny a complete ADU permit application within 60 days. We use that waiting time to start permit-free work on your main house.
Yes. Every ADU needs a building permit, and coastal lots may need extra review. We prepare and submit the plans and manage inspections through final sign-off.
In most San Diego jurisdictions, yes, long-term rentals are allowed. Short-term rental rules vary by city, so we will check the rules for your address during the consult.
Yes. Proactive Edge Developments holds California CSLB license #768545 (Class B, General Building) and is fully insured and bonded. You can verify the license at cslb.ca.gov.
One rendering of your project, made with our in-house design software, so you can see the finished build before construction starts. There is no cost and no obligation.
Tell us about your project and we'll create one free 3D rendering with our in-house software, plus a free on-site estimate. No cost, no obligation.
We'll only use your details to discuss your project. No spam, ever.