Planning a high-end ADU in Solana Beach? Solana Beach mixes coastal lots west of the freeway with larger hillside and inland parcels to the east. Proactive Edge Developments is a CSLB-licensed San Diego County general contractor. We build ADUs end to end, handle the City of Solana Beach permit process, and include a free 3D rendering so you see the result before we start. License CSLB #768545.
Solana Beach sets its ADU standards in Municipal Code 17.20.040(D) and offers a Pre-Approved ADU program. Source: City of Solana Beach, SBMC 17.20.040(D).
Coastal Zone: parts of Solana Beach are inside the California Coastal Zone. Projects there can need a coastal development permit on top of the building permit, which adds review time. We check your parcel before design starts.
State timeline: when there is already a home on the lot, California law (Gov. Code §66317) requires the city or county to approve or deny a complete ADU application within 60 days.
We prepare the plan set, submit it, answer plan-check corrections, and schedule every inspection through final sign-off.

At 3680–3682 Curlew St in San Diego, we added a second story to the main house and converted the garage into a separate unit. The owner now has two rentable addresses on one lot. It's the project we point Solana Beach homeowners to first, because it shows our permitting, structural, and finish work in one place.
Every new client gets one free 3D rendering, made with our in-house design software — so you see the finished result before a single nail goes in.
Solana Beach projects are permitted by the City of Solana Beach (Community Development, Planning). Solana Beach sets its ADU standards in Municipal Code 17.20.040(D) and offers a Pre-Approved ADU program.
It can. Parts of Solana Beach fall inside the California Coastal Zone, where some projects need a coastal development permit in addition to a building permit. We check your parcel's status before design starts.
Under California law (Gov. Code §66317), when there is already a home on the lot, the City of Solana Beach has to approve or deny a complete ADU application within 60 days. Plan corrections and resubmittals add time, so we give you a written schedule at your estimate.
We work across San Diego County. Our featured project is the Curlew St lot split in the City of San Diego; ask us for the closest completed work to your address during your consult.
One rendering of your Solana Beach ADU, made with our in-house design software, so you see the result before construction starts. No cost and no obligation.